With
regard to a damaged building, a drying and monitoring programme will be
discussed with you, and the technician will arrange to regularly monitor
the reduction of moisture in the building structure and air.
Unfortunately it is extremely difficult to determine the exact length of
time it will take to dry the property, as this can depend upon several factors
including the depth of any standing water, the length of time the structure
was submerged or wet and the structural materials used, some of which may
be vapour barriers inhibiting the evaporation of moisture. Regular monitoring
will provide an ongoing record of the progress.
It is essential that the drying equipment installed is used as directed
by the technician, as the longer the equipment is allowed to operate the
shorter the drying time. |
|
|